Jadestone Energy (JSE.L) completed drilling the second well in its 2026 Malaysia infill drilling campaign.
The well was brought online at 2,800 barrels of oil per day, the independent upstream production and development company said Monday.
The company has also drilled a third contingent well following encouraging results from the first two wells, with results to be reported in due course.