West Red Lake Gold Mines (WRLG.V) provided drill results from its Madsen mine in Ontario, demonstrating strong grades and continuity across multiple areas.
Results include 176.04 grams per tonne (g/t) gold over 5.3 meters, 128.32 g/t gold over 4.5 m, and 35.72 g/t gold over 13.35 m from the Austin 955 and 904 complexes, the mining company said Tuesday.
"These results continue to build our confidence in the geological model and the potential for these areas to be integrated into the Madsen mine plan in 2027," said Will Robinson, West Red Lake's vice president of exploration.
West red Lake said it is now advancing into previously unmined material at the 904 complex, providing the company with additional flexibility as it advances the mining inventory.