Wallbridge Mining (WM.TO) provided the final assays from seven holes completed during its 2026 metallurgical drilling program at the Fenelon gold project in Quebec.
The results added Wallbridge's confidence in the geological and grade continuity of the deposit while providing representative samples for metallurgical testing to support an ongoing pre-feasibility study (PFS), Wallbridge said Wednesday.
Highlights include 52.30 grams per tonne (g/t) gold over 2.1 meters, 2.84 g/t gold over 6.4 m and 3.18 g/t gold over 3.8 m.
Wallbridge expects to complete the PFS in late 2027 or early 2028.
Price: $0.09, Change: $-0.01, Percent Change: -5.26%