Taihan Cable & Solution (KRX:001440) secured a power cable and accessories supply contract from Korea Electric Power (KRX:015760) valued at 133 billion won, according to a Friday filing with the Korean Exchange.
The contract is slated to be fulfilled by March 27, 2028.
The above contract is a turnkey project for the construction of a national core power grid to supply stable electricity generated in the East Coast region.