SDIC Power's (SHA:600886) unit 3 of phase 3 of the 660-megawatt SDIC Qinzhou Power Plant went online on Monday following a 168-hour trial operation, according to a Tuesday filing with the Shanghai bourse.
The power plant, operated by SDIC Qinzhou No. 2 Power Generation, has a capacity of 3.3 billion kilowatt-hours and a heating capacity of about 800 tons per hour.
The power plant has high-efficiency dust removal, desulfurization, and denitrification facilities, the filing said.