New Break Resources (NBRK.CN) on Tuesday said it reumed drilling at the Moray gold project in Ontario.
The summer drilling program is expected to consist of 2,500 meters in at least 11 drill holes. The first two to three holes are designed to fill in the top of the existing mineralized zone.
Earlier this year, New Break drilled 3,376 meters in 22 drill holes. Highlights included 3.46 grams per tonne (g/t) gold over 38.6 meters from 82.0 to 120.6 meters.
New Break shares last traded on June 29, closing at $0.24 per share on the Canadian Securities Exchange.