Li-FT Power (LIFT.V) on Tuesday reported results from the 2026 winter and 2025 summer programs at the Yellowknife Lithium Project in the Northwest Territories.
The 2026 winter program drilled 17 holes at the BIG area of the project while the 2025 summer program drilled three holes on the Fi Main, Fi SW and Ki pegmatites.
Highlights of the results include 21 meters at 1.09% lithium oxide at Fi Main, 18 m at 1.41% Li2O at Ki, and 22 m at 1.09% Li2O at BIG East.