Japan Gold (JG.V) on Tuesday said it completed a 21.3 line-kilometer Controlled-Source Audio Magnetotellurics (CSAMT) and natural source (AMT) geophysical survey at the Mizobe Project in Kyushu, Japan.
The company has combined the CSAMT/AMT survey results with recently completed gravity and magnetic inversion models, structural interpretations, and results from its 2023 and 2025 drilling programs to generate a refined geological model of the Mizobe Project, it said.
The company will use the geological model to refine existing targets, identify additional high-priority drill targets, and finalize a multi-target drill program.
The company's shares were last seen down C$0.01 or 12.5% to C$0.07 on the TSX Venture Exchange.
Price: $0.07, Change: $-0.01, Percent Change: -12.50%