FINWIRES · TerminalLIVE
FINWIRES

KLSE:PETGAS

2 stories mentioning KLSE:PETGASUpdated 47d ago

Every FINWIRES story that references KLSE:PETGAS, newest first.

Asia

Malaysian Shares End in Green Bucking Regional Losses

Malaysian shares ended in the green on Thursday, as investor interest rebounded, bucking regional losses.The FTSE Bursa Malaysia KLCI, the main gauge of Malaysian stocks, gained 10.5 points to end 0.6% higher at 1,683.26. The day range was between 1,673.70 and 1,689.83.In local news, Malaysia's gas supply remains stable, with most electricity generation still backed by domestic sources, while the government continues to monitor the energy sector amid global uncertainties, The Star reported, citing Science, Technology and Innovation Minister Datuk Chang Lih Kang.In corporate news, shares of Petronas Gas (KLSE:PETGAS) gained over 1% on close after it signed a binding heads of agreement with Tenaga Nasional (KLSE:TENAGA) unit Integrax, to jointly develop the third regasification terminal (RGT-3) in Perak, Malaysia. The project will be developed through a special purpose vehicle, and is based on a floating storage regasification unit (FSRU) conceptWhereas, shares of Velesto Energy (KLSE:VELESTO) slid about 2% on Thursday's close after its unit Velesto Sumber secured a contract from Northern Gulf Petroleum to provide jack-up drilling services offshore Thailand.

FTSE Bursa Malaysia KLCIKLSE:PETGASKLSE:TENAGAKLSE:VELESTO
Asia

Petronas Gas, Tenaga Nasional Unit to Develop Third Regasification Terminal

Petronas Gas (KLSE:PETGAS) signed a binding heads of agreement with Tenaga Nasional (KLSE:TENAGA) unit Integrax, to jointly develop the third regasification terminal (RGT-3) in Perak, Malaysia.The project will be developed through a special purpose vehicle, and is based on a floating storage regasification unit (FSRU) concept, according to a Thursday Malaysian bourse filing.The planned facility boasts an engineered LNG storage capacity of 170,000 cubic metres and a send-out capacity of 500 million standard cubic feet per day.The fuel procurement and supply arm of Tenaga Nasional, TNB Fuel Services, will underwrite the terminal's capacity in phases. Full capacity expected from 2030 onwards, it added.

KLSE:PETGASKLSE:TENAGA

Track with the FINWIRES app suite