Predator Oil & Gas (PRD.L) awarded Nabi Construction (Trinidad and Tobago) a contract to carry out civil engineering works to prepare the drilling location for the Snowcap-3 well.
The Trinidad and Tobago well is planned to be drilled as a vertical hole to a measured depth of 5,450 feet, with drilling expected to take 20 days, the oil and gas company said Wednesday.
Nabi Construction will begin site work immediately.