Power Construction of China (SHA:601669) subsidiary Sinohydro Bureau 5 signed an about 8.93-billion-yuan subcontract with Iraq's Rida Co. for the Basra seawater desalination project's water transmission system.
The project features a 1-million-cubic-meter daily capacity system with 240 kilometers of pipelines, one main pump station and nine receiving stations in Basra Governorate, according to a Thursday filing with the Shanghai bourse.
The timeline includes six months of limited commencement followed by a 1,350-day construction period, plus a 24-month defect liability period.
Shares of the engineering construction company rose 1% in recent trade.