Gateway Mining (ASX:GML) intersected gold mineralization at its Yandal project in Western Australia during initial first-pass air-core drilling across Celia South and the Great Western Shear Corridor structures, according to a Wednesday filing with the Australian bourse.
Results include 12 meters at 1.4 grams per tonne grade of gold from 60 meters, 10 meters at 2.2 g/t grade of gold from 66 meters, and 16 meters at 1 g/t grade of gold from 104 meters, the filing said.
Additionally, reverse circulation drilling will start in the week of June 15 to focus on depth extensions, per the filing.