Enegex (ASX:ENX) secured a Reverse Circulation (RC) drill rig, now on site, to begin a drill program of 3,000 meters to 3,500 meters on the Gogo project in the Ivory Coast, testing three targets within the Bonoubana trend, according to a Thursday Australian bourse filing.
A 19-hole, air core drilling program testing the southern section of an active artisanal mine site encountered intercepts of four meters at 6.2 grams-per-tonne grade of gold from eight meters, as well as 12 meters at 1.68 g/t grade of gold from 28 meters.
Limited additional aircore drilling at the Kalama Bave prospect found a result of four meters at 6.1 g/t grade of gold from 32 meters.