FINWIRES · TerminalLIVE
FINWIRES

Gulf Energy Repair Bill Could Hit $58 Billion Amid Supply Chain Strain, Rystad Says

-- The cost of repairing energy infrastructure damaged by the Middle East conflict could reach $58 billion, with broader knock-on effects likely to delay global energy projects, Rystad Energy strategists said in a note on Wednesday.

The total costs for oil and gas facilities alone are projected to reach $50 billion, with overall repair spending across energy, power, and industrial assets ranging from $34 billion to $58 billion. The midpoint estimate stands at $46 billion.

Rystad said the scale of destruction has expanded in recent weeks following continued military strikes across parts of the region, before easing after an Apr. 8 ceasefire between the US and Iran.

Though capital is available for reconstruction, Satwani said the main constraint is now access to equipment, contractors, and logistics capacity rather than financing.

"This is no longer just a story about damaged facilities in the Gulf. It is a stress test for the global energy supply chain," Karan Satwani, senior analyst, supply chain research at Rystad Energy, said. "Repair work does not create new capacity; it redirects existing capacity."

Rystad said that competition for engineering and construction resources is already intensifying as contractors remain committed to a wave of liquefied natural gas and offshore projects sanctioned since 2023, raising the risk of delays and inflationary pressure across global energy investment.

The consultancy said recovery timelines are diverging depending on the severity of damage and local execution capacity, with some lightly affected facilities restarting within weeks. However, heavily damaged assets requiring major equipment replacement could take years to restore.

Downstream refining and petrochemical plants account for the largest share of estimated costs, followed by upstream and midstream assets.

Meanwhile, at a country level, Iran faces the largest impact, with potential repair costs of up to $19 billion, driven by damage to gas processing facilities at South Pars, petrochemical complexes, and refining and export infrastructure.

Rystad said Qatar's damage profile is more concentrated but technically complex, centered on Ras Laffan Industrial City, where liquefied natural gas facilities and gas-to-liquids assets have been affected, potentially slowing ongoing expansion projects.

The consultancy said that engineering, procurement, and construction activity will account for the largest share of spending, noting that equipment bottlenecks and long-lead delivery times will determine the pace of recovery.

Fatih Birol, executive director of the International Energy Agency, reportedly said that more than 80 energy facilities have been attacked in the Middle East since the outbreak of the conflict on Feb. 28.

相关文章

Asia

中国联合网络通信公司第一季度利润下降18%

中国联网通信(SHA:600050)周三在上海证券交易所发布的公告显示,该公司第一季度归属于股东的净利润同比下降18%至21.4亿元人民币,即每股0.068元人民币。 去年同期,该公司归属于股东的净利润为26.1亿元人民币,即每股0.083元人民币。 营业收入同比下降1%至1028亿元人民币,而去年同期为1034亿元人民币。 该公司股价在早盘交易中下跌2%。

$SHA:600050
International

韩国3月份生产者价格上涨4.1%。

根据韩国央行周三公布的初步数据,韩国3月份生产者价格指数(PPI)同比上涨4.1%,创下自2023年2月以来的最快涨幅。 除电力、燃气、水和废物处理成本当月下降1.1%外,其他所有类别的PPI均出现上涨,推动了PPI同比上涨。 数据显示,农产品、林业及海产品、制造业和服务业的PPI分别上涨0.5%、5.9%和3.1%。 数据显示,3月份PPI环比上涨1.6%。

$^KOSDAQ$^KS11
Asia

金属粉末制品公司称,3月份季度粉末产品收入几乎翻番,股价下跌4%。

金属粉末制品公司(ASX:MPW)周三向澳大利亚证券交易所提交的文件显示,该公司3月份季度的粉末收入环比几乎翻了一番,毛利率维持在50%左右。 该公司在该季度共收到35份订单,其中包括18份回头客订单和17份首次交付订单。 该公司表示,其“下一代1号”项目进展顺利,符合预算,首批粉末已成功生产,并正朝着100吨的设计产能逐步提升。 该公司持有1310万澳元现金,无任何债务。 该公司股价在周三的交易中下跌了4%。

$ASX:MPW