-- 根据周三提交给澳大利亚证券交易所的文件,Cannindah Resources(ASX:CAE)表示,已在其位于昆士兰州的Mt Cannindah项目的Cannindah角砾岩铜金矿床中发现了“显著”的资源扩张潜力。 该公司表示,目前矿产资源估算(MRE)范围内的一些历史钻孔的化验数据不完整,这凸显了升级MRE的潜在机会。此外,在600米范围以南沿走向延伸约400米处,已绘制出额外的露头围岩角砾岩。 文件还补充道,位于南部矿产资源边界以南550米处的几个历史金刚石钻孔虽然含有肉眼可见的角砾岩和硫化物,但从未进行过取样,目前已送去进行分析。 该公司将再钻探17个钻孔,总进尺3500米,以测试高优先级的资源增长目标。计划在当前钻探计划完成后更新MRE。
Related Articles
Research Alert: Vale Q1: Solid Y/y Growth Offset By Cost Headwinds And Consensus Miss
CFRA, an independent research provider, has providedwith the following research alert. Analysts at CFRA have summarized their opinion as follows:Vale delivered mixed Q1 results with adjusted EBITDA of $3.9B (+21% Y/Y) and revenues of $9.3B (+14% Y/Y), though sales missed consensus by $237M and adjusted EPS of $0.44 missed by $0.06. Free cash flow reached $813M (+61% Y/Y) despite working capital headwinds from seasonal disbursements. Base metals emerged as the standout performer with EBITDA surging to $1.2B (+116% Y/Y), supported by copper EBITDA of $949M (+74% Y/Y) on tight market conditions and higher realized prices. Management indicated 2026 cost guidance is trending toward the upper end of ranges given BRL appreciation against USD. Iron ore faces margin pressure with C1 costs rising to $23.60/t (+12% Y/Y) primarily from currency headwinds, though volumes remained resilient at 59.4Mt (+5% Y/Y). The balance sheet remains solid with net debt at $13.6B and leverage contained at 0.8x LTM adjusted EBITDA. We believe Vale's diversified portfolio provides resilience, with its base metals strength offsetting iron ore margin compression in the near term.
Paras Defence and Space Technologies to Develop Anechoic Chambers
Paras Defence and Space Technologies (NSE:PARAS, BOM:543367) has entered into a memorandum of understanding with Bengaluru-based Complus Systems and Faridabad-based JV Micronics to jointly pursue opportunities in anechoic and semi-anechoic chambers, according to an Indian bourse filing on Tuesday.Shares of the company rose nearly 1% in Wednesday's trade.The consortium will undertake "design, development, manufacturing, installation, and servicing" of such facilities in India and overseas, the filing said.Paras Defence will act as the lead partner, managing the design, development and manufacturing of the chambers, while the other partners will provide technical and manufacturing support, it added.
Beach Energy's Waitsia Project Production Run-Rate Offers Potential Upside to Reduced Guidance, Euroz Hartleys Says
Beach Energy's (ASX:BPT) fiscal third-quarter results included lower-than-expected production and a cut to guidance, prompting Euroz Hartleys to revise its output forecast for the company to the mid-point of updated guidance, the equity research firm said in a Wednesday note.Euroz Hartleys noted, however, that the Waitsia project's production run-rate and Otway Basin customer nominations through the fiscal fourth quarter offer potential upside to the upper end of the company's guidance.Beach Energy on Tuesday revised its fiscal year 2026 production guidance to between 19.4 million and 20.3 million barrels of oil equivalent from a previous range of 19.7 million to 22 million barrels of oil equivalent.Additional disclosure on Waitsia swap arrangements has provided a clearer outlook, triggering increases in the equity research firm's fiscal year 2027 to fiscal year 2029 earnings forecasts. Euroz Hartleys previously modelled all swaps as to be returned in-kind, but now noted that more than half of them are sell-back arrangements that earn revenue.It maintained a hold recommendation on Beach Energy while lowering its price target to AU$1.15 per share from AU$1.18, based on an updated sum-of-the-parts valuation.Beach Energy shares fell 1% in recent Wednesday trade.