FINWIRES · TerminalLIVE
FINWIRES

BNI Securities将Indosat的评级从“弱于大盘”上调至“中性”,目标价为2000印尼盾。

By

-- 根据FactSet调查的分析师报告,Indosat(IDX:ISAT)的平均评级为“买入”,平均目标价为2,781.39印尼盾。 (报道来自北美、亚洲和欧洲主要银行及研究机构的股票、商品和经济研究。研究机构可通过以下链接联系我们:https://www..com/contact-us

Related Articles

Mining & Metals

InPlay Oil Confirms Monthly Dividend for May 2026

InPlay Oil's (IPO.TO) board of directors declared a monthly cash dividend of $0.09 per common share, unchanged from the prior month.It is payable on May 29, 2026, to shareholders of record at the close of business on May 15.

$IPO.TO
Mining & Metals

BeMetals Resumes Trading on TSXV; To Launch 1-For-10 Reverse Stock Split

BeMetals' (BMET.V) common shares will resume trading on the TSX Venture Exchange (TSXV), effective at the open of market on May 5, it said Friday.The company also received approval from the TSXV to consolidate its outstanding common shares on the basis of one new common share for every 10 common shares. The reverse stock split will take effect at the start of trading on May 8.The 294.4-million common shares issued and outstanding prior to the consolidation will be reduced to about 29.4-million common shares, the company said. It expects to send letters of transmittal to registered holders of its common shares for use in transmitting their existing share certificates to its registrar and transfer agent in exchange for new certificates representing the number of post-consolidation common shares to which each shareholder is entitled.The company's shares last traded Apr. 15, closing at $0.06 on the TSXV.

$BMET.V
Commodities

Update: Trump Reportedly Signs Keystone XL Revival Plan With 550,000 b/d Capacity

(Adds confirmation of the permit from White House in paragraph three.)US President Donald Trump approved a Keystone XL revival plan, granting a permit for a 645-mile pipeline that could lift Canadian crude exports to the US by over 12%, multiple media outlets reported Thursday.Trump reportedly signed a cross-border permit allowing a project to move Canadian crude from the US-Canada border to Wyoming.The permit was published on the White House website, granting permission for a 36-inch diameter pipeline that reaches a shut-off valve or pumping station within 2,000 feet inside the US from the border with Canada, in Phillips County, Montana.South Bow, a Canadian pipeline firm, and its US partner, Bridger Pipeline, are leading the project, which requires a presidential permit to move forward, the reports said.The proposal follows a new US route, replacing the earlier Keystone XL plan that former President Joe Biden canceled in 2021 after environmental and Indigenous opposition.The project will still use sections of pipe already built in Canada, where the Keystone XL system had secured full approvals before cancellation, according to the reports.South Bow, created in 2024 by TC Energy to manage its pipeline business, is overseeing development alongside Bridger Pipeline.Bridger Pipeline proposed the pipeline from Phillips County, Montana, to Guernsey, Wyoming, capable of transporting up to 550,000 barrels per day, the reports added.Analysts said Guernsey lacks refining demand, so developers must build further connections to hubs such as Cushing, Oklahoma, Patoka, Illinois, and the US Gulf Coast, while securing additional state permits, the reports said.