FINWIRES · TerminalLIVE
FINWIRES

韩国4月份出口同比增长48%,主要得益于半导体行业的增长

By

-- 韩国贸易、工业和资源部(MOTIR)周五发布的数据显示,人工智能热潮在4月份的韩国贸易中发挥了重要作用,受半导体出货量激增的推动,韩国4月份出口同比增长48%。 据官方统计,韩国4月份出口额达到858.9亿美元,其中芯片出货量增长最为显著,同比增长173.5%,达到319亿美元。这是韩国4月份出口额连续第11个月增长。 受人工智能热潮推动,全球对固态硬盘的需求激增,韩国计算机及零部件出口额增长五倍,达到40.8亿美元,创下历史新高。 4月份的出口额是韩国有史以来第二高的月度出口额,仅次于3月份创下的866亿美元的历史最高纪录。 据《韩国先驱报》报道,韩国交通运输部表示,受中东危机导致的航运中断以及韩国汽车制造商为应对华盛顿的贸易政策而扩大在美国的生产规模的影响,韩国4月份汽车出口额同比下降5.5%至61.7亿美元。 该部门还表示,受美伊战争的影响,4月份对中东的出口额同比下降25.1%至12.7亿美元。 进口方面,韩国4月份进口额同比增长16.7%至621.1亿美元,贸易顺差达237.7亿美元。

Related Articles

Research

Research Alert: Mg: Q1 Earnings Well Ahead Of Expectations; Guidance Revisions Mixed

CFRA, an independent research provider, has providedwith the following research alert. Analysts at CFRA have summarized their opinion as follows:Magna International (MG) posted Q1 adjusted EPS of $1.38 vs. $0.78 (+77%), well ahead of the $1.01 consensus, owing to much stronger-than-expected sales and margins, as revenue rose 3.1% to $10.38B ($110M above consensus) and adjusted EBIT margin expanded 190 bps to 5.4% (120 bps above consensus). MG lowered 2026 revenue guidance to $41.5B-$43.1B from $41.9B-$43.5B (current consensus: $42.4B). The only other change to previous guidance was a reduction in its net interest expense expectation to $165M from $180M. Other prior guidance was unchanged. While the company did not raise full-year EPS guidance, we think a raise is now more likely given the magnitude of the beat, although we think management's caution is understandable given current macro uncertainties. Given MG's broad product diversification across the automotive parts and equipment space, and status as the largest North American auto supplier, we think the strength of its Q1 results has positive implications for other auto suppliers.

$MG
Research

Stifel Nicolaus Initiates Coverage on Septerna With Buy Rating, $43 Price Target

(covers equity, commodity and economic research from major banks and research firms in North America, Asia and Europe. Research providers may contact us here: https://www..com/contact-us)

$SEPN
Mining & Metals

Belo Sun Mining Provides Update on Volte Grande Project

Belo Sun Mining (BSX.TO) expects to provide a comprehensive update on the Volte Grande Project in Brazil by the end of the second quarter, the company said on Friday.Belo Sun was re-issued the installation license (LI) with updated conditions, for the project last February, and has since been working with the authorities to clarify the technical work required to satisfy the conditions. The update will outline the next phase of work as the project advances toward construction.The new LI, which is valid until April 2029, maintains the same project scope, studies, and layout, and allows Belo Sun to advance the project, the company added."The reissued Installation License is an important step forward for the Project and provides greater clarity on the permitting framework. We are encouraged by SEMAS's constructive and collaborative approach following the reinstatement of the LI, and by the ongoing dialogue as we work together to advance the Project to maximize its benefits for all stakeholders. Our focus remains advancing the Project responsibly while supporting employment, training and economic opportunities for local communities," said chief executive Clovis Torres.Belo Sun shares closed down $0.02, to $1.20 on Thursday on the Toronto Stock Exchange.

$BSX.TO